News Summary
Wolves Den Parkway will close for essential repairs starting September 30, impacting access to Watford City High School and Fox Hills Elementary School. Detours will be required through McKenzie Park Apartments, with strict prohibitions on driveway access through the Rough Rider Center. The repairs, initiated due to rapidly deteriorating road conditions, will last until at least October 7, requiring special care for newly installed concrete panels. Residents and students are urged to remain cautious during this time.
Watford City
Wolves Den Parkway will be closed for necessary repairs starting September 30, 2025, at 6 a.m. This closure is expected to impact the access routes to both Watford City High School and Fox Hills Elementary School.
The closure will extend between the two entrances of the Rough Rider Center (RRC), forcing drivers to take a detour through the McKenzie Park Apartments to reach the schools. It is important to note that driving through the RRC parking lot to rejoin the road is strictly prohibited.
Immediate Repairs Necessary
According to reports from the Watford City police, sections of the concrete roadway have been deteriorating at a rapid pace, leading to the decision for immediate repairs. The city aims to ensure the safety of all drivers and students by addressing these concerns promptly.
Closure Duration
The repair work on Wolves Den Parkway is expected to last until at least October 7, 2025. During this time, new concrete panels will need to cure properly, which necessitates five to seven days without any vehicle traffic on the area. The city urges residents and parents to plan their routes accordingly during the closure to minimize disruption.
Impact on Students and Local Residents
The closure of Wolves Den Parkway presents challenges for parents and students commuting to school. With the road blocked, there will be a need for increased vigilance among drivers taking detours to ensure the safety of children and other pedestrians along altered routes.
Background Context
The condition of the roadway had been gradually worsening over time, prompting concern from local authorities. The decision to close the parkway follows growing reports of structural issues, indicating that urgent action was needed to maintain safety for all road users.
Conclusion
In light of the coming changes, residents are encouraged to stay informed about the ongoing repairs. Continuous updates regarding the status of the repairs and any changes to the detour routes will likely be shared through local communication channels in the upcoming weeks. The city is dedicated to completing the repairs efficiently, minimizing inconvenience, and ensuring that the road is safe for all travelers once reopened.
Deeper Dive: News & Info About This Topic
HERE Resources
Norfolk School Board Postpones Vote on School Closures
New Jersey Construction Industry Set for Significant Growth
Starbucks Closes Six Baltimore Locations Amid Restructuring
Ravens Suffer Major Setback Against Chiefs in Week 4
Major Road Improvements with New Interchanges on Bangerter Highway
Starbucks Closing Multiple Locations in Maryland and Beyond
Starbucks Closes Six Cafes in Baltimore Amid National Strategy
St. Louis Schools Consider Mass Closures Amid Enrollment Crisis
Homecoming Parade and Football Game Canceled in Alexandria
Severe Monsoon Thunderstorms Disrupt Phoenix
Additional Resources
- KXNet: Road closure to affect school entrances in Watford City
- Wikipedia: Watford City
- The Dickinson Press: NDDOT and McKenzie County celebrate completion of 100 million U.S. Highway 85 expansion
- Google Search: Watford City North Dakota news
- KFYR TV: Highway 85 project completed between Watford City & Long X
- Encyclopedia Britannica: North Dakota
- Williston Herald: Construction to begin on Highway 2
- Google News: North Dakota road closures


